Apply Now

Resources

How much does a commercial kitchen remodel cost?

A commercial kitchen remodel's cost depends mostly on whether utilities, the hood and the grease system change, how much equipment is replaced, and which code upgrades get triggered. A cosmetic refresh costs far less than moving lines and utilities. Written contractor and equipment quotes are the only reliable budget, plus a contingency for surprises.

Apply Now

What drives commercial kitchen remodel cost the most?

The biggest cost drivers are utility and ventilation changes: moving or adding a hood, rerouting gas lines, upgrading electrical service, cutting slab for floor drains and plumbing, and resizing grease handling. Equipment replacement is next. Finishes such as walls, ceilings and flooring matter, but usually less than what happens behind them.

  • Hood and ventilation: new or relocated hoods, ductwork, makeup air. See hood installation funding.
  • Plumbing and drains: relocated sinks, floor drains, grease interceptor changes.
  • Electrical and gas: added circuits, panel or service upgrades, gas line sizing. See induction conversions.
  • Equipment: how much is replaced versus reused.
  • Code upgrades: fire suppression, accessibility, health department items triggered by the work.
  • Region and access: local labor rates, night work and how easily crews reach the space.

Is it cheaper to keep equipment in the same place?

Usually, yes. Keeping cooking equipment under the existing hood and sinks near existing drains avoids the most expensive work: new ductwork, gas and electrical runs, and cutting slab. A remodel that replaces equipment in place can cost far less than one that reorganizes the kitchen, even if new equipment is the same.

Layout changes can still pay back when the current layout wastes labor, like cooks crossing the kitchen for every plate. Ask your designer to price two versions: a same-footprint upgrade and a reconfigured layout. Compare the difference against realistic labor savings and added capacity, not just appearance.

What should you get quoted before setting a budget?

Get written quotes for construction from a contractor experienced with commercial kitchens, itemized equipment quotes from a dealer, and separate quotes for specialty trades such as hood, fire suppression, refrigeration and electrical. Ask each to list inclusions, exclusions and assumptions so you can compare them on the same scope.

  1. Demolition and disposal.
  2. Plumbing, drains and grease handling.
  3. Electrical and gas.
  4. Hood, ductwork, makeup air and fire suppression.
  5. Walls, ceilings, flooring and finishes.
  6. Equipment, delivery, installation and startup.
  7. Design, engineering, permits and inspections.
  8. Lost sales and payroll during closure.
  9. Contingency.

Items missing from a bid are the ones that show up later as change orders.

How much contingency should a remodel include?

Many owners hold back a contingency because remodels reveal hidden conditions, such as damaged drain lines, outdated wiring or inspection requirements, once walls and floors are opened. The right level depends on the age of the space and how much is being opened up. Your contractor can suggest a level based on what they see.

Older buildings and projects that cut slab or move utilities deserve more cushion than same-footprint equipment swaps. Keep the contingency separate in your budget so it isn't absorbed into upgrades you add mid-project. A line of credit can serve as a standby source for overruns.

What does closing the kitchen really cost?

The true cost of closing for a remodel is lost gross profit plus bills that continue anyway: rent, insurance, loan payments, utilities, software and staff you keep so you don't lose them. Estimate it from your own weekly sales for the same period last year, and include a slower first week after reopening.

Many owners fund that gap with working capital arranged before the kitchen closes, when bank deposits still reflect normal sales. Compare the closure cost with phasing the work around service. Phasing usually raises construction labor cost but protects sales.

How do owners fund a kitchen remodel?

Most owners combine structures: equipment financing for new units, a term loan for construction, ventilation, plumbing and electrical work, and working capital or a line of credit for downtime and overruns. Matching each budget line to the right structure usually costs less than forcing everything into one product.

When bids are in, apply online to compare structures for your full budget.

Frequently asked questions

Which parts of a remodel can be equipment-financed?

Movable, itemized equipment such as ranges, fryers, ovens, refrigeration and dish machines, often with dealer delivery and installation. Construction, utilities, ductwork and finishes generally stay with the building and are funded with a term loan or working capital.

How long does a commercial kitchen remodel take?

Equipment swaps in place may take days, while remodels that move utilities, cut slab or change the hood can close a kitchen for weeks, plus time for design, permits and equipment lead times. Your contractor's schedule and inspection dates set the real timeline.

What do funders review for a kitchen remodel?

Requirements vary by product and funder; many look at time in business, monthly revenue and credit. Funders also review bank statements, existing obligations, contractor bids, equipment quotes and your lease.

Why do remodel quotes vary so much?

Contractors may assume different scopes, exclude different items, price risk differently or have different availability. Compare bids line by line on inclusions and exclusions, not just the total, before choosing.

Where can I find current cost data for my area?

Regional construction cost data publishers and local contractors familiar with commercial kitchens are the best sources. Published averages are useful only for early planning; set your funding amount from written bids.

Bids in for your remodel?

Apply online and match each budget line to the funding that fits.

Apply Now

Updated September 14, 2026 · Prime Kitchen Capital Funding Team